Commercial construction project managementthat turns chaos into calm.

Gallarzo Management is an independent owner's representative firm delivering 95% on-time, 12% average savings, and 98% quality complianceon $10M–$100M+ commercial projects across the U.S.

  • Independent of contractors & vendors
  • Pre-feasibility through warranty
  • Lender-, board-, and tenant-grade reporting
  • BIM, ESG, and Cx fluency built in
Live snapshotportfolio.gallarzomanagement.com
95%
On-time
Trailing 12 months
12%
Avg savings
Owner-side delivered
0
OSHA RIR
Last 6 quarters
$2.4B+
Delivered
180+ projects
Active programs14
Sunset Crossing92%
Harbor Logistics Park68%
Verde Apartments41%

Trusted by developers, owners, investors, and Fortune 500 tenants

AURIONMERIDIANPACIFIC NORTHVANTAGENORTHCRESTSTELLA REITATELIER
Why Gallarzo

The owner's seat at the table — held by professionals.

You wouldn't sign a lease without your broker. You shouldn't sign a GMP without your owner's rep. We sit on your side of every decision.

Differentiator

Owner's Advocate Advantage

We're independent of contractors and vendors. The only outcomes on our scorecard are yours.

Differentiator

Chaos-to-Calm Process

A documented operating system instruments every phase from feasibility through warranty.

Differentiator

Quantified Performance

Every engagement reports against schedule, cost, quality, safety, and sustainability KPIs.

Owner-side vs. the alternatives

Three options. One that's independent.

Most “construction management” is general-contracting in disguise. Here’s the unflinching comparison.

CapabilityGallarzo (Owner’s-rep)GC’s “CM” serviceIn-house owner-side
Independent from contractor & vendors
Senior PM accountable end-to-end
Pre-design / feasibility expertise
Instrumented operating system (KPIs, dashboards)
Lender-/board-grade reporting
Net-Zero / WELL / ESG fluency
Outcome-aligned fee structures
Cross-portfolio benchmarking
Read: ● capable · ◐ partial · ○ not by default
Featured Projects

Hard problems, delivered cleanly.

Selected case studies across retail, industrial, office, healthcare, hospitality, and adaptive reuse.

View all case studies
Retail & Shopping Centers
Anaheim, CA · 2025
Sunset Crossing — Mixed-Use Retail Center
Schedule
On-time vs. anchor lease (-2 days)
Cost
14% under GMP
Tenants ready
18 / 18 at grand open

Lifestyle center with anchor cinema, food hall, and 18 in-line tenants opened on time and 14% under GMP.

Read case study
Industrial & Warehouses
Fontana, CA · 2024
Harbor Logistics Park — Class A Distribution
Schedule
11 weeks ahead
Lease-up
Two tenants signed at substantial completion
Cost
Within 1% of baseline GMP

1M+ sq ft Class A distribution facility delivered 11 weeks ahead of REIT's lease-up calendar.

Read case study
Healthcare & Institutional
Irvine, CA · 2024
North Pacific MOB — Outpatient Specialty
OSHPD cycles
0 plan-check overruns
Imaging install
On-vendor calendar
Patient continuity
Maintained across the campus

Specialty MOB with imaging suites delivered with zero OSHPD/HCAI plan-check cycle overruns.

Read case study
Office Buildings & Corporate Campuses
Costa Mesa, CA · 2024
Cypress Tower — Class A Office HQ
WELL
Gold (verified)
Tenant move-in
On committed date
OpEx Year 1
9% below forecast

Class A HQ tower with workplace strategy program and WELL Gold certification.

Read case study
Hospitality
Newport Beach, CA · 2023
The Atelier — Boutique Hotel Conversion
Opening
On-time for holiday season
Adaptive-reuse savings
27% vs. ground-up baseline

1970s office converted to a 140-room boutique hotel — open for the holiday season.

Read case study
Multifamily & Residential Complexes
Long Beach, CA · 2024
Verde Apartments — Net-Zero Multifamily
Operational EUI
30% below baseline
Lease-up
92% in first six months

Net-zero-ready multifamily with on-site PV and microgrid storage architected from day one.

Read case study
Proof

What our clients actually say.

Selected quotes from owners, developers, and operators who've worked with us across retail, industrial, and healthcare.

"Their grip on the anchor calendar saved the deal. We've handed them three more projects."

VP Development
National retail developer

"Owner-side discipline that actually shows up in the dashboard. Our IC stopped asking for status reports."

Managing Director
Institutional logistics REIT

"They closed out the hospital expansion with zero OSHPD/HCAI cycle overruns. That doesn't happen."

VP Facilities
Regional health system
Interactive Tool

How much could owner-side PM save you on your next project?

60 seconds. Five inputs. A defensible savings range plus an NPV view your investment committee can read.

Sample · $48M Class A office live
$5.8M
Projected savings
11.2%
vs. GMP baseline
8.4×
ROI on fee
Schedule recovery
7–11 weeks
Risk buffer freed
$2.1M contingency
Industry Impact

The numbers behind From Chaos to Calm.

Performance reported quarterly, audited annually, and aligned to your investment committee's standards.

180+
Projects managed
$2.4B+
Value delivered
95%
On-time delivery
12%+
Average savings
98%
Quality compliance
90%+
Client retention
1,820+
OSHA-clean days
6
California counties
The next step

Bring us into your next project — at the start.

The earlier we sit at your table, the more we save. Schedule a 15-minute call with a senior PM.